Dubai Fourth Corridor Guide: Route, Phases and Travel-Time Cuts

A practical guide to Dubai’s approved 80-kilometre Fourth Corridor, including its Abu Dhabi–Dubai–Sharjah route, two phases, capacity, planned travel-time reductions and what remains unconfirmed.

Traffic travelling on Dubai–Al Ain Road near Dubai Academic City in the UAE
Archive 971 / DubaiDubai–Al Ain Road near Dubai Academic City, photographed in Dubai on 22 October 2010. Photo: Fadi Fayad Al Taoba, CC BY 3.0, via Wikimedia Commons.

Overview

Dubai’s approved New Fourth Corridor is an approximately 80-kilometre, 12-lane road connection between Al Faya Road in Abu Dhabi and Al Shanouf Road in Sharjah. It will be built in two phases, link strategic transport and development areas, and include 72 bridges, 17 tunnels and 45 stormwater drainage culverts.

What matters

The project is approved but not open. Phase 1 carries the announced AED 3.5 billion cost; that figure should not be treated as the confirmed cost of the entire route. Travel-time and population figures are forecasts, while final junction maps, construction sequencing and opening dates remain unannounced.

Practical checklist

  • 01
    Identify the phase

    Separate the Sharjah-to-Dubai Phase 1 scope from the Dubai-to-Abu Dhabi Phase 2 scope.

  • 02
    Label the cost correctly

    AED 3.5 billion is the announced cost for Phase 1, not a published total for both phases.

  • 03
    Check official opening notices

    Do not treat the approved corridor as a usable road until RTA confirms an opening.

  • 04
    Use current navigation

    Continue following existing roads, live traffic and current speed limits.

  • 05
    Watch for diversions

    Review RTA notices when construction affects Dubai–Al Ain Road or connecting routes.

  • 06
    Verify property claims

    Ask for an official interchange map before accepting access or travel-time claims.

  • 07
    Check commercial-vehicle rules

    Existing truck routes and restrictions remain in force until authorities announce changes.

  • 08
    Treat forecasts as forecasts

    Capacity and journey-time reductions are planning projections, not guaranteed trip times.

  • 09
    Recheck the timeline

    Look for later RTA or Dubai Government announcements because no completion date is confirmed.

Our method

Time Out Dubai was used only to identify fresh interest in the New Fourth Corridor. We checked Archive 971’s published and draft library and found no dedicated guide to this road project. On 17 September 2026, we independently reviewed the UAE official announcement as reproduced by Al Etihad from WAM and cross-checked the Dubai Government announcement indexed by the Dubai Media Office. We separated Phase 1 from Phase 2, labelled projections as forecasts and did not invent a completion date or final interchange map. The featured image’s Wikimedia Commons page identifies Dubai–Al Ain Road near Dubai Academic City, credits Fadi Fayad Al Taoba, records UAE coordinates of 25.098424, 55.382853 and confirms a CC BY 3.0 licence.

01Use Time Out Dubai only for topic discovery
02Check all Archive 971 published and draft coverage for overlap
03Verify the project through authoritative UAE reporting
04Separate the two phases and their individual specifications
05Distinguish Phase 1 cost from whole-project cost
06Label capacity and time savings as projections
07Avoid inventing completion dates, junctions or property impacts
08Verify the image’s Dubai location, author, date and licence

Dubai’s Fourth Corridor: confirmed facts at a glance

Dubai has approved an 80-kilometre road corridor intended to strengthen links between Abu Dhabi, Dubai and Sharjah. The New Fourth Corridor will run from Al Faya Road in Abu Dhabi to Al Shanouf Road in Sharjah and will be delivered in two phases.

The first phase is a 30-kilometre section between Al Shanouf Road and Dubai–Al Ain Road. Its announced cost is approximately AED 3.5 billion. The second phase will continue for 50 kilometres from Dubai–Al Ain Road to Al Faya Road.

| Project detail | Officially announced position |
| --- | --- |
| Total corridor | Approximately 80 kilometres |
| Overall route | Al Faya Road, Abu Dhabi to Al Shanouf Road, Sharjah |
| Delivery | Two phases |
| Phase 1 | Al Shanouf Road to Dubai–Al Ain Road, about 30 km |
| Phase 1 cost | Approximately AED 3.5 billion |
| Phase 2 | Dubai–Al Ain Road to Al Faya Road, about 50 km |
| Road width | 12 lanes across both directions |
| Total structures | 72 bridges, 17 tunnels and 45 stormwater drainage culverts |
| Published completion date | Not announced in the approval statement |

This is an approved infrastructure project, but it is not an open road. Motorists should continue using current routes and live navigation until official openings are announced.

Where the Fourth Corridor will run

The route is designed as a new inter-emirate connection between Al Shanouf Road in Sharjah, Dubai–Al Ain Road in Dubai and Al Faya Road in Abu Dhabi. It will pass several strategic locations, including Al Maktoum International Airport, Al Marmoom Desert Conservation Reserve, Al Wohoosh Desert Conservation Reserve and the Etihad Rail route.

The corridor is also expected to serve residential and development areas along its alignment. The approval announcement does not provide a final junction-by-junction public map, entrance list or opening schedule. Community-level access claims should therefore be treated cautiously until Roads and Transport Authority plans identify the exact interchanges.

The government describes it as the UAE’s fourth strategic inter-emirate road corridor, following Sheikh Zayed Road and Al Ittihad Road, Sheikh Mohammed bin Zayed Road and Emirates Road.

Phase 1: Sharjah to Dubai–Al Ain Road

Phase 1 will cover approximately 30 kilometres from Al Shanouf Road in Sharjah to Dubai–Al Ain Road. The project is planned as a 12-lane corridor across both directions, with capacity for up to 24,000 vehicles per hour in both directions.

Official projections say this section could reduce the relevant journey from 35 minutes to 14 minutes, a reduction of about 60 percent, and serve around 600,000 people. These are forecast benefits for the completed corridor, not current travel times guaranteed for every trip.

The announced civil works include approximately 55 lane-kilometres of roads at ground level, 2.5 kilometres of tunnels and 21 kilometres of bridges and ramps. Phase 1 also includes widening Dubai–Al Ain Road from three to four lanes in each direction between Emirates Road and Lehbab Road, plus upgrades to four major intersections.

The AED 3.5 billion figure applies to Phase 1. It should not be presented as the total cost of the full 80-kilometre corridor unless a later official announcement confirms that position.

Phase 2: Dubai–Al Ain Road to Abu Dhabi

Phase 2 is planned to extend approximately 50 kilometres from Dubai–Al Ain Road to Al Faya Road in Abu Dhabi. Like the first phase, it is designed with 12 lanes across both directions and capacity for about 24,000 vehicles per hour.

The official projection is a journey-time reduction of 52 percent, from 50 minutes to 24 minutes, with the corridor serving around 3.1 million people. The announced scope includes about 190 lane-kilometres of ground-level roads, 3.5 kilometres of tunnels and 157 kilometres of bridges and ramps.

No completion or public-opening date for either phase was stated in the 16 September 2026 approval announcement. Treat any date shown in property marketing, social posts or unofficial maps as unconfirmed unless it is supported by RTA or Dubai Government.

Why the corridor is being built

The Fourth Corridor is intended to add a new high-capacity route between the emirates and connect expanding districts with the federal road network. It is also designed to support logistics and commercial transport, particularly movement associated with Al Maktoum International Airport and Etihad Rail.

RTA says the new route should help divert through traffic, especially trucks, away from urban areas. That could reduce pressure on existing corridors and improve the separation between local trips and long-distance commercial traffic.

The project is not a simple widening of one current road. It combines new road sections, junction upgrades, tunnels, bridges, ramps, drainage infrastructure and widening along part of Dubai–Al Ain Road.

What the travel-time claims mean

The announced reductions—35 to 14 minutes in Phase 1 and 50 to 24 minutes in Phase 2—are planning forecasts for the relevant corridor sections. They should not be added together as a guaranteed door-to-door saving between any two homes or workplaces.

Actual journey time after opening will depend on where a driver joins and leaves the road, traffic conditions, interchange design and delays on connecting roads. The 24,000-vehicle-per-hour figure is a design capacity across both directions, not a promise that congestion will disappear.

For current journeys, continue checking live navigation and official traffic notices. The future corridor should only be used in route planning after RTA confirms an opened section.

UAE-specific considerations for motorists and residents

Motorists using Dubai–Al Ain Road should watch for future lane changes, speed-limit adjustments and diversions when construction packages begin. The approval itself does not change today’s traffic rules or create a usable shortcut.

Residents and buyers near the broad alignment should avoid assuming that a development will have direct access. A corridor can pass near a community while its nearest junction remains several kilometres away. Wait for official interchange maps before calculating travel times or attaching a transport premium to a property.

Commercial operators should distinguish between the project’s long-term logistics purpose and current truck routes or restrictions. Existing permitted routes, timings and weight rules remain applicable until authorities publish changes.

Because the road passes sensitive desert areas, the announced inclusion of tunnels, bridges and 45 stormwater drainage culverts is relevant to design and resilience. It does not give the public permission to access protected reserves or construction zones.

Practical checklist

First confirm whether the information relates to Phase 1, Phase 2 or the complete 80-kilometre corridor. Check that cost figures are labelled correctly: AED 3.5 billion is the announced Phase 1 cost.

Use RTA, Dubai Government or WAM-linked reporting for construction and opening updates. Do not navigate through a road shown only on an unofficial future map.

If the works affect a regular commute, review official diversion notices, allow extra time and check the current speed limit before travelling. Businesses should separately verify truck routes, delivery access and restrictions.

For property decisions, request the official source behind any claimed junction or travel time. Recheck the claim when detailed design maps and opening dates are published.

Bottom line

The New Fourth Corridor is a major approved road project connecting Sharjah, Dubai and Abu Dhabi over approximately 80 kilometres. Phase 1 will link Al Shanouf Road with Dubai–Al Ain Road, while Phase 2 will continue to Al Faya Road.

Its announced scale—12 lanes, 72 bridges, 17 tunnels and major travel-time targets—makes it important for future inter-emirate mobility. The responsible position today is to treat the alignment, phases and projected capacity as confirmed, while recognising that final junction details, construction sequencing and opening dates have not yet been publicly announced.

Frequently asked questions

What is Dubai’s New Fourth Corridor?+

It is an approved approximately 80-kilometre, 12-lane road corridor planned between Al Faya Road in Abu Dhabi and Al Shanouf Road in Sharjah, passing through Dubai.

What route will the Fourth Corridor follow?+

The broad approved route runs from Al Shanouf Road to Dubai–Al Ain Road in Phase 1, then from Dubai–Al Ain Road to Al Faya Road in Phase 2. Final public junction details have not yet been announced.

How much will the Fourth Corridor cost?+

The announced cost is approximately AED 3.5 billion for Phase 1. The approval statement did not publish a total cost for both phases.

When will the Fourth Corridor open?+

No completion or public-opening date for either phase was announced with the project approval on 16 September 2026.

How much time could the new road save?+

Official projections say Phase 1 could reduce the relevant journey from 35 minutes to 14 minutes, while Phase 2 could reduce it from 50 minutes to 24 minutes. Actual trips will depend on entry points, exits, traffic and connecting roads.

Will the corridor connect Abu Dhabi, Dubai and Sharjah?+

Yes. The approved alignment links Al Faya Road in Abu Dhabi, Dubai–Al Ain Road in Dubai and Al Shanouf Road in Sharjah.

Will Dubai–Al Ain Road be widened?+

Phase 1 includes widening Dubai–Al Ain Road from three to four lanes in each direction between Emirates Road and Lehbab Road and upgrading four major intersections.

Will the road serve Al Maktoum International Airport?+

The official announcement identifies Al Maktoum International Airport as one of the strategic locations along the corridor, but detailed public access junctions have not yet been released.

Can motorists use the Fourth Corridor now?+

No. It is an approved future project. Drivers should use current roads and official navigation until RTA announces that a section has opened.

Sources & verification

We prioritise primary and authoritative sources. Prices, availability and rules can change, so reconfirm important details before acting.

  1. Al Etihad — WAM report on the New Fourth Corridor approval
  2. Dubai Media Office — Hamdan bin Mohammed approves New Fourth Corridor project
  3. Featured image — Fadi Fayad Al Taoba / Wikimedia Commons, CC BY 3.0
  4. Creative Commons Attribution 3.0 licence